Anybody recently had one built? Trying to get a ballpark of what cost should be. TIA
|
|
|
Re: Shop Cost
[Re: Edge]
#8860551
05/31/23 12:36 AM
|
Joined: Jan 2008
Posts: 9,354
scot
THF Trophy Hunter
|
THF Trophy Hunter
Joined: Jan 2008
Posts: 9,354 |
Buddy of mine paid 56,000 for a 30x40, 2 roll ups and a walk in door, spray foam and electrical included and slab. West of DFW.
|
|
|
Re: Shop Cost
[Re: Edge]
#8860554
05/31/23 12:41 AM
|
Joined: Aug 2012
Posts: 15,567
TexFlip
THF Celebrity
|
THF Celebrity
Joined: Aug 2012
Posts: 15,567 |
Just to make sure that it is done thoroughly, I go both ways.
|
|
|
Re: Shop Cost
[Re: TexFlip]
#8860560
05/31/23 12:47 AM
|
Joined: Jul 2009
Posts: 81
Edge
OP
Outdoorsman
|
OP
Outdoorsman
Joined: Jul 2009
Posts: 81 |
|
|
|
Re: Shop Cost
[Re: Edge]
#8860564
05/31/23 12:57 AM
|
Joined: Jun 2015
Posts: 18,709
Roll-Tide
THF Celebrity
|
THF Celebrity
Joined: Jun 2015
Posts: 18,709 |
I am NOT affiliated with this company.
But, Wolf Steel Buildings is on my YouTube feed. I watch their videos. They give very specific pricing.
I cannot speak for their work. They are in Texas
|
|
|
Re: Shop Cost
[Re: Edge]
#8860566
05/31/23 01:00 AM
|
Joined: Oct 2017
Posts: 5,951
angus1956
THF Trophy Hunter
|
THF Trophy Hunter
Joined: Oct 2017
Posts: 5,951 |
Mine was finished the end of January here are the details.
Size 30x50' with 30x5' walkway in front. I Beam Construction 3 insulated overhead doors. 1 3/0' man door 4 windows Plumbing for sink & toilet Electric & water ran to building site. Foamed with 1" closed cell foam. Ceiling painted to cover foam Fully wired with 200 Amp service Lighting Gutters Roadbase & rock driveway 2x4 framing for 30x14 mancave. A/C & Heating in mancave. 4x8' wall covering throughout.
Total approx. 70K
Last edited by angus1956; 05/31/23 01:01 AM.
|
|
|
Re: Shop Cost
[Re: Edge]
#8860593
05/31/23 01:55 AM
|
Joined: Nov 2018
Posts: 1,948
Davis300
Pro Tracker
|
Pro Tracker
Joined: Nov 2018
Posts: 1,948 |
I got a $45k quote 3 months ago for a 30 x 25. Pad, concrete, steel, spray foam, etc…hard pass at that price. (Parker County)
|
|
|
Re: Shop Cost
[Re: angus1956]
#8860595
05/31/23 02:03 AM
|
Joined: Sep 2007
Posts: 3,816
TDK
Extreme Tracker
|
Extreme Tracker
Joined: Sep 2007
Posts: 3,816 |
Mine was finished the end of January here are the details.
Size 30x50' with 30x5' walkway in front. I Beam Construction 3 insulated overhead doors. 1 3/0' man door 4 windows Plumbing for sink & toilet Electric & water ran to building site. Foamed with 1" closed cell foam. Ceiling painted to cover foam Fully wired with 200 Amp service Lighting Gutters Roadbase & rock driveway 2x4 framing for 30x14 mancave. A/C & Heating in mancave. 4x8' wall covering throughout.
Total approx. 70K
Pretty good price. I was quoted $75k for a 40x60 building with 25x40 overhang on the front, two roll ups, one walk through door, I-beam construction, standard insulation. I’d handle electric and plumbing.
A.M. Little Bespoke Gunmakers LLC
|
|
|
Re: Shop Cost
[Re: TDK]
#8860610
05/31/23 02:25 AM
|
Joined: Oct 2017
Posts: 5,951
angus1956
THF Trophy Hunter
|
THF Trophy Hunter
Joined: Oct 2017
Posts: 5,951 |
Mine was finished the end of January here are the details.
Size 30x50' with 30x5' walkway in front. I Beam Construction 3 insulated overhead doors. 1 3/0' man door 4 windows Plumbing for sink & toilet Electric & water ran to building site. Foamed with 1" closed cell foam. Ceiling painted to cover foam Fully wired with 200 Amp service Lighting Gutters Roadbase & rock driveway 2x4 framing for 30x14 mancave. A/C & Heating in mancave. 4x8' wall covering throughout.
Total approx. 70K
Pretty good price. I was quoted $75k for a 40x60 building with 25x40 overhang on the front, two roll ups, one walk through door, I-beam construction, standard insulation. I’d handle electric and plumbing. I forgot the 25'x15' overhang. If it was something I could do I did it. You can see my entire process in the DIY Section, post is "Shop Build Underway."
|
|
|
Re: Shop Cost
[Re: Edge]
#8860675
05/31/23 11:04 AM
|
Joined: Oct 2008
Posts: 15,184
Tbar
THF Celebrity
|
THF Celebrity
Joined: Oct 2008
Posts: 15,184 |
50 x 70 with 25 x 50 overhang, 8 x 70Loft and staircase. Dirt work, slab, steel, electrical, insulation, four 12 x 14 OHD(2 are electric), 2 personnel doors, four 3x6 windows, rock around structure. $185k
6-month lead time..... 3-month build time.
Make America Great Again
|
|
|
Re: Shop Cost
[Re: Edge]
#8860677
05/31/23 11:09 AM
|
Joined: Aug 2021
Posts: 1,109
DukeCigars
Pro Tracker
|
Pro Tracker
Joined: Aug 2021
Posts: 1,109 |
Lookin like around $50/sq ft is what you can roughly bass it on
Car guy. Serial entrepreneur. Terrible golfer.
|
|
|
Re: Shop Cost
[Re: Edge]
#8860962
05/31/23 09:47 PM
|
Joined: Jun 2013
Posts: 6,578
Wburke2010
THF Trophy Hunter
|
THF Trophy Hunter
Joined: Jun 2013
Posts: 6,578 |
Should be able to do it for around 35 sq ft without doors or windows.
MW Ranch Services 903-303-4523 Metal buildings, welding, equipment repair, dirt work
|
|
|
Re: Shop Cost
[Re: Edge]
#8861016
05/31/23 11:26 PM
|
Joined: Sep 2004
Posts: 2,147
jrfan
Veteran Tracker
|
Veteran Tracker
Joined: Sep 2004
Posts: 2,147 |
I was quoted $35k for a 30’X40’ using two shipping containers as the outside walls. This was with two roll up doors and one man door.
|
|
|
Re: Shop Cost
[Re: Edge]
#8861138
06/01/23 04:45 AM
|
Joined: Feb 2011
Posts: 585
AISsupply
Tracker
|
Tracker
Joined: Feb 2011
Posts: 585 |
Just finished building mine, 64 x 40 pad with a 50 x 40 mueller premium kit. Concrete was $26k and kit was $24k, erection cost about 4-5k
|
|
|
Re: Shop Cost
[Re: Edge]
#8861139
06/01/23 05:07 AM
|
Joined: Aug 2009
Posts: 22,716
BigPig
THF Celebrity
|
THF Celebrity
Joined: Aug 2009
Posts: 22,716 |
In 2020 mine was about $75k for a 30x40x14 with 3 12x12 doors, 4 windows, 1 man door, 6 inch thick slab, 250tons of select fill, electrical, spray foam, paint, gutters all the way to the street, brick half walls, 150yards of stone for driveway.
I’d hate to think of what it cost today.
|
|
|