Main Menu
Advertisement
Affiliates
Advertisement
Newest Members
Zeb B, hillcountryredraider, duckbrx, yodasheet, Harddr672
60446 Registered Users
Top Posters
dogcatcher 77387
stxranchman 52092
RWH24 44568
rifleman 43783
BOBO the Clown 41089
BMD 40539
Big Orn 37484
txshntr 33684
bill oxner 32627
sig226fan (Rguns.com) 30570
facebook
Forum Stats
60446 Members
45 Forums
475837 Topics
6242361 Posts

Max Online: 16728 @ 03/25/12 08:51 AM
Topic Options
#5823612 - 07/08/15 06:53 PM Help building duck slough
Exbellicus Offline
Pro Tracker

Registered: 01/24/08
Posts: 1371
Loc: DFW
Working up a plan to build a duck slough on my property. I've never done anything like this before, so any suggestions would be greatly appreciated. The property is about 35 acres and the current pond is .3 acres and is part of a small creek channel. The set of woods you see on the right hosts a much larger creek that feeds in to a lake. The property is graded and is lowest at the bottom.

My plan right now is to rent a tractor and cut out that blue area about 36" deep, then plant japanese and brown millet. Then around end of Oct hope it rains a lot or draft water out of the tank to flood it.


Top
#5823889 - 07/08/15 09:04 PM Re: Help building duck slough [Re: Exbellicus]
wal1809 Offline
THF Celebrity

Registered: 08/26/05
Posts: 10847
Loc: Texas
What do you mean cut it 36 inches deep?
_________________________
www.snakebreaker.com

www.wanoscustomcalls.com

Ruffling Feathers Guide Service

UTHFDHGTG Port O'Conner, Texas Dec. 9 Hunt 10,11
lodging 361 983 4371




Top
#5823998 - 07/08/15 10:01 PM Re: Help building duck slough [Re: wal1809]
Exbellicus Offline
Pro Tracker

Registered: 01/24/08
Posts: 1371
Loc: DFW
Originally Posted By: wal1809
What do you mean cut it 36 inches deep?


Dig out a pit 3 feet deep throughout that whole blue area basically making it a wetland.

Top
#5824131 - 07/08/15 11:21 PM Re: Help building duck slough [Re: Exbellicus]
brazosboyt Offline
Pro Tracker

Registered: 05/09/11
Posts: 1677
Ok. Looking at your scale id say you are 300 x 150 ish x 3' deep.

That's about 5000 cubic yards of dirt or 400+ dump truck loads of dirt.

With a 300 hp tractor, 12 yard belly scraper, and a d5+ dozers with rippers, you can move about
250 yards/day. So 20 days if you aren't moving the cut spoils very far.


With a tractor and a 2 yard bucket you may cut and move 75-100 yards/day.

So, if the tractor has the weight and hp to actually cut it, you'd be 50 days.

My advice-build a levee on it with flood control structure to drain it.

Top
#5824198 - 07/09/15 05:39 AM Re: Help building duck slough [Re: Exbellicus]
wal1809 Offline
THF Celebrity

Registered: 08/26/05
Posts: 10847
Loc: Texas
What brazos said
_________________________
www.snakebreaker.com

www.wanoscustomcalls.com

Ruffling Feathers Guide Service

UTHFDHGTG Port O'Conner, Texas Dec. 9 Hunt 10,11
lodging 361 983 4371




Top
#5824361 - 07/09/15 08:51 AM Re: Help building duck slough [Re: Exbellicus]
woodduckhunter Offline
Woodsman

Registered: 04/25/11
Posts: 212
Do you have a topo or elevation changes of the area? Even if you acquire the equipment, you want to be careful when you remove the top 36 inches of top soil. In some areas you could be left with a poor quality dirt that requires a load of help to grow anything. If you could get the existing pond drained, I would consider having someone come in with a dozer and convert it. We have taken a typical stock pond before, and basically filled it in. Making the "pond" shallow, and creating a much bigger shallow area where we pushed the dirt from 3" at a time. This would probably cost about the same as renting equip. to DIY

Top
#5824481 - 07/09/15 10:08 AM Re: Help building duck slough [Re: Exbellicus]
wal1809 Offline
THF Celebrity

Registered: 08/26/05
Posts: 10847
Loc: Texas
If it is flat enough to levy it up then just do the levy. The water level will vary which is quite alright. It can be 3 feet in some ares and 5 inches in another. All of which is OK. Optimum would be 6 to 8 inches but you don't have to have picture perfect optimum to attract a respectable amount of birds.

I did exactly what you are doing. Every bird that comes in hits the 4 foot water in the middle and then they swim into the vegetation. You can levy that place of yours for very little money. Rather than do it yourself, check bulldozer guys. When I inquired they were $900 a day. That was a bulldozer and a track hoe. With those machines they can have you completed in less than a day.
_________________________
www.snakebreaker.com

www.wanoscustomcalls.com

Ruffling Feathers Guide Service

UTHFDHGTG Port O'Conner, Texas Dec. 9 Hunt 10,11
lodging 361 983 4371




Top
#5824488 - 07/09/15 10:10 AM Re: Help building duck slough [Re: Exbellicus]
wal1809 Offline
THF Celebrity

Registered: 08/26/05
Posts: 10847
Loc: Texas
I think the biggest problem you will face is water volume. When you go from your pond to the duck pond you will lose a massive amount of water to saturation. Until you overcome saturation and evaporation you will be able to keep up. The question should be, does that pond have the volume it takes to overcome saturation, evaporation and then fill to a hunt-able depth, then maintain that throughout the season?

So if the dozer and track hoe can finish a levy in no time, then let them open the retention pond up to hold more water. Maybe hire them for two days and get yourself a lot better situated water wise, if in fact you find water volume would be a problem.


Edited by wal1809 (07/09/15 10:12 AM)
_________________________
www.snakebreaker.com

www.wanoscustomcalls.com

Ruffling Feathers Guide Service

UTHFDHGTG Port O'Conner, Texas Dec. 9 Hunt 10,11
lodging 361 983 4371




Top
#5826234 - 07/10/15 01:22 PM Re: Help building duck slough [Re: brazosboyt]
ZachW Online   content
Woodsman

Registered: 10/11/13
Posts: 181
Loc: Texas, TX
Originally Posted By: brazosboyt
Ok. Looking at your scale id say you are 300 x 150 ish x 3' deep.

That's about 5000 cubic yards of dirt or 400+ dump truck loads of dirt.

With a 300 hp tractor, 12 yard belly scraper, and a d5+ dozers with rippers, you can move about
250 yards/day. So 20 days if you aren't moving the cut spoils very far.


With a tractor and a 2 yard bucket you may cut and move 75-100 yards/day.

So, if the tractor has the weight and hp to actually cut it, you'd be 50 days.

My advice-build a levee on it with flood control structure to drain it.


When you put it like that... that's a lot of dirt.

Top
#5826346 - 07/10/15 02:26 PM Re: Help building duck slough [Re: ZachW]
Gdogg Offline
Extreme Tracker

Registered: 02/04/05
Posts: 4557
Loc: Liberty Hill
Is that road going to be an issue?

Top
#5826359 - 07/10/15 02:36 PM Re: Help building duck slough [Re: Gdogg]
garrett Offline
THF Celebrity

Registered: 01/19/06
Posts: 10287
Originally Posted By: Gdogg
Is that road going to be an issue?


I would avoid being so close to the road, gives the GW to much of a view
_________________________
Dear Ag2015, please assume this post is a joke and is not to be taken serious

Top
#5826388 - 07/10/15 02:58 PM Re: Help building duck slough [Re: ZachW]
Exbellicus Offline
Pro Tracker

Registered: 01/24/08
Posts: 1371
Loc: DFW
Yeah that plan is definitely not going to fit in the budget! It's pretty flat so it sounds like a levee would be possible. So the levee is just a buildup of dirt at the lowest end and the sides?


Top
#5826924 - 07/10/15 09:34 PM Re: Help building duck slough [Re: Exbellicus]
wal1809 Offline
THF Celebrity

Registered: 08/26/05
Posts: 10847
Loc: Texas
Yes. A levy is formed usually by pushing dirt into place. Be sure you put a good drainage system. It doesnt have to be expensive, just good.
_________________________
www.snakebreaker.com

www.wanoscustomcalls.com

Ruffling Feathers Guide Service

UTHFDHGTG Port O'Conner, Texas Dec. 9 Hunt 10,11
lodging 361 983 4371




Top
#5827014 - 07/10/15 10:52 PM Re: Help building duck slough [Re: Exbellicus]
muddyz Offline
Tracker

Registered: 11/19/09
Posts: 682
Loc: McKinney, TX
Just a wild guess here but the lowest spot on that now is due East of the current pond with another low spot to the SE off the point of the black line you just drew to mark the levee. Figure out which way the water enters and exits those spots and then block it off and you are good.

Top
#5828144 - 07/11/15 10:27 PM Re: Help building duck slough [Re: wal1809]
TTUhunter4 Online   content
Tracker

Registered: 07/03/10
Posts: 626
Loc: Texas
Originally Posted By: wal1809
If it is flat enough to levy it up then just do the levy. The water level will vary which is quite alright. It can be 3 feet in some ares and 5 inches in another. All of which is OK. Optimum would be 6 to 8 inches but you don't have to have picture perfect optimum to attract a respectable amount of birds.

I did exactly what you are doing. Every bird that comes in hits the 4 foot water in the middle and then they swim into the vegetation. You can levy that place of yours for very little money. Rather than do it yourself, check bulldozer guys. When I inquired they were $900 a day. That was a bulldozer and a track hoe. With those machines they can have you completed in less than a day.


Are you saying $900 a day total for a dozer and track hoe?